Rates of Pole Sign (double sided) for the minimum duration of 3 months

LOCATION

QUANTITY

AMOUNT

TOTAL AMOUNT

Pole sign location Al asif square to Buraq Petrol Pump main super highway One month Minimum Duration Three Months

with permission DMC EAST

20

2,000

40,000

Jamali Bridge to Quetta town Scheme #

33 One month Minimum Duration Three Months with permission DMC EAST

20

2,000

40,000

Maymmar Mor main Superhighway One month Minimum Duration Three Months

with permission DMC EAST

16

2,000

32,000

Gulshan -e- Maymmar One month

Minimum Duration Three Months with permission DMC EAST

16

2,000

32,000

Ahsanabad road One month Minimum Duration Three Months with permission

DMC EAST

10

2,000

32,000

Surjani Town 4K

14

2,000

28,000

 

 

 

 

MADRAS CHOWK

10

2,000

20,000

NEW Sabzi Mandi

12

2,000

24,000

Bismillaha Centre main Super Highway

8

2,000

16,000

Jamali Bridge towards towards surjani

town

12

2,000

24,000

Paradise Bakery

12

2,000

24,000

Safora Goath

12

2,000

24,000

Kanezz Fatima to Super Highway

10

2,000

20,000

Pole Sign size (6x4) Iron Frame for 03 Months

Artavia © 2021. All Rights Reserved. | Powered by ABDULLAH Global Pvt Ltd.

    Online Query Artavia